Tuesday, February 1, 2011

Cimbali Junior Overflow

subtenant

The first-Demolition work is now done: kitchen get out, get out carpets, walls out. Is hardly a stone on the other (if they were but stones, here is all the wood stud frame !)... And come with the first work (of course) the first problem. Problems that were previously not able to see. One of them is currently solid, but - hopefully - be not permanent. The previous owner had a dog and 2 cats. They have obviously always slept in the room of the daughter who will become our living room. There, it smells pretty strictly to the animal-breeding and - worse - are animal lodger extended not live with. The house is totally verfloht! Such were my legs after I had measured on Monday one hour walls:


A really nasty affair. And unfortunately our Nils looks almost as out of bad. Andreas has, immediately called "Flea-Bombs" concerned that we have over night in each room "detonate" leave. But, if it's bringing what remains to be seen first.

the beasts to become the medium term are already sir. Much more serious are the many small and large defects, which occur so gradually to light: a lot of water pipes in the garden (apparently rain-drainage of the neighbors), moldy exterior cladding, no insulation in the walls, insulation in the roof completely wrong, etc. etc. Anyone who has ever built or renovated know, probably just what I mean. In my Excel planning means the item "contingency" and has been generous, but will be enough if it's ... We are friends now, even with the thought of cooking something small, the bathroom a bit plain and the garage to build no. When building (whether new and / or order-building) have to be flexible given. This seems to be the same everywhere in the world ...

One can be escaped, so to have a great view! :-)

0 comments:

Post a Comment